Warning starting helper PPLpr8: System Error. Code: 1069

I would like to know about “WARN : W2013 : Error starting helper PPLpr8: System Error. Code: 1069.”.
When I restart workflow service, this warning occurred. However all of processes run safely. What does this warning mean? Should I need to do something?

Based on the shared warning, I assume that there is an issue with the user under which the OL Connect Workflow LPD Server service is running.

You may also want to check what is being logged in the following log file the moment the shared warning occurs:

C:\ProgramData\Objectif Lune\PlanetPress Workflow 8\PlanetPress Watch\Log\lpd <Date> .log

@Marten

Thank you for your reply.
Let me ask you about LPD and LPR.

I think it’s as you say, the OL Connect Workflow LPD Server service and the OL Connect Workflow LPR Client service are stopped. However I already mentioned, currently, all of processes are working safely.

Do I need to start those services? When do I need to start those services? For example, If I wanted to output report as a paper to printer, should I need to start them?

Currently, all of reports are outputted as PDF then send to email. Can I use the workflow service without those services in the future also?

The OL Connect Workflow LPD Server service starts automatically when a configuration that includes at least one active LPD Input task is started (source: LPD Input - OL Connect Workflow 2024.1 Help).

Therefore, I expect that you do not have to start the LPD Server service, as long as your configuration does not contain any active LPD Input tasks.